Search

Methodology

Posts for this category
Filters
7 articles match your criteria
Don't force your projects into the wrong mold: choose the tool tailored to your needs.

Should you adopt ClickUp? A complete analysis for project managers

This article analyzes ClickUp as an alternative to Microsoft Planner for project management. It details its hierarchical structure, the versatility of its views, the task window, and its advanced features. The study also compares their integration, evaluates the pricing model (from the free plan to the Business plan), and guides the choice based on the team's maturity level.

Calendar Icon  Published on 09/17/2026 | 
Methodology  | 
Views Icon  Post read 0 times | 
Time Icon  Read in 0 Mn | 
Off Off Off Off Off
Turn IT complexity into strategic clarity

SWOT Analysis for IT Projects, From Diagnosis to Action Plan

SWOT analysis is a key strategic assessment tool for securing IT projects and ERP deployments. By confronting internal strengths and weaknesses with external opportunities and threats, this collective approach brings together management, IT teams, and business experts. It allows organizations to objectify risks, align strategy, and design an effective operational action plan. 

Calendar Icon  Published on 10/15/2026 | 
Methodology  | 
Views Icon  Post read 0 times | 
Time Icon  Read in 0 Mn | 
Off Off Off Off Off
Quality is not something that can be improvise

From rigorous documentation to integrated agility: the evolution of testing paradigms

This article analyzes the transition from document-based test management to the integrated Azure DevOps approach. It emphasizes the importance of initial rigor (scenarios, prerequisites, expected results) and describes the industrialization of processes via the Web Runner. This shift enables complete traceability and accelerated bug resolution within a dynamic workflow.

Calendar Icon  Published on 05/10/2026 | 
Methodology  | 
Views Icon  Post read 0 times | 
Time Icon  Read in 0 Mn | 
Off Off Off Off Off
Visual agility at the service of collective performance.

Microsoft Planner: Optimizing collaborative management within the 365 ecosystem

Microsoft Planner structures collaborative work through an intuitive Kanban interface. The tool enables granular task management: color-coded labeling, prioritization, progress tracking, and document centralization. Its integration with Teams and Azure DevOps optimizes productivity. Despite the lack of a native budgeting module, exporting to Excel and Power BI ensures effective management.

Calendar Icon  Published on 04/26/2026 | 
Methodology  | 
Views Icon  Post read 0 times | 
Time Icon  Read in 0 Mn | 
Off Off Off Off Off
Budget managment

Mastering the ERP Budget: From Analytical Codification to Sprint Steering

This article presents my method for structuring an ERP budget based on functional domains, sprints, and phases (analysis, setup, etc.). It compares budget entries to actual data via Excel, using a compound code (domain-sprint-phase) and the SUMIFS function, which provides a precise 3D dashboard to anticipate variances and manage ongoing projects.

Calendar Icon  Published on 01/25/2026 | 
Methodology  | 
Views Icon  Post read 0 times | 
Time Icon  Read in 0 Mn | 
Off Off Off Off Off
Decrypt the why, design the how

Functional analysis in an ERP project, a central document

Functional analysis in an ERP project is an indispensable deliverable. It is essential for defining the project scope, ensuring a shared understanding of needs, and strengthening transparency with the client. The article describes its ideal structure (including introduction, requirements, models, and constraints) and demonstrates how this document serves as a vital guide throughout the design, development, testing, and change management phases.

Calendar Icon  Published on 10/26/2025 | 
Methodology  | 
Views Icon  Post read 0 times | 
Time Icon  Read in 0 Mn | 
Off Off Off Off Off
Views: 1368